Prefabrication

Proactive and Productive

Rosendin thoroughly explores all prefabrication and packaging opportunities to increase project productivity, optimize customer schedules, reduce labor costs, and control waste. Our prefabrication and BIM teams work closely together to quickly transform computer-generated models into electrical building work packages for just-in-time construction. Under this system, we only deliver fabricated assemblies to job sites as close to installation time as possible. This ensures complete control and eliminates the risk of storing materials on-site, where they are vulnerable to damage or theft. This process also speeds installation, as we only need to handle the related components once.

Areas of Expertise
  • Conduit Runs
  • Device Assemblies
  • Duct Banks
  • Electric Rooms
  • IDF and MDF Rooms
  • Light Fixtures
  • Lighting Control Systems
  • Over Head Rough
  • Pre-Assembled Wall Rough-Ins
  • Rooftop Equipment Assemblies
  • Low Voltage and Communication Systems
  • Supports
LED light fixtures
wire spools
20%

Targeted percentage of prefabricated components used on a given project

100%

Targeted percentage of pre-planned work packages

Nearly 1 Million

Total amount of square footage dedicated to our in-house prefabrication operations, across nine regional locations

Featured Projects

Project VA11

Sterling, VA

G30 Whittle School

Washington, DC

Related Content

Company

CyrusOne Data Center: a Hyper-Scaled Project

Cyrus-One's Data Center in Sterling, VA is dedicated to providing better internet coverage, higher speed, and more data storage.

Duration: 6:01

Share This Page