Project Summary

This agreement, with an existing, leading technology client, utilizes Rosendin not only as an electrical/design contractor but as a general contractor for the design-build of nine (9) colocation computer rooms. Under the role of the general contractor, Rosendin managed several subcontractors, developing project and maintenance schedules, taking the project from design to commissioning phase in under one year. Rosendin was also responsible for the installation of energy-saving hot air and cooling systems, and electrical conduit, distribution, and metering systems.

ASH Build-Outs

12 Megawatt colocation data center with Rosendin as General Contractor and Electrical Contractor responsibilities

Location
Ashburn, VA
Client
Confidential
General Contractor
HITT
Duration
12 Months
Budget
$6.341 Million
Size
70,000 SF