Rosendin leads the industry by using innovative technology to do jobs faster, safer, and with more efficiency. We take pride in training our specialists in cutting-edge and emerging technologies.
Rosendin is proud to be recognized as the #1 Top Workplace 2020 for large companies by the Bay Area News Group!
Rosendin Holdings, Inc., the parent company to Rosendin and Modular Power Solutions (MPS), is pleased to announce it has established The Rosendin Foundation, a 501(c)(3) non-profit incorporated to positively impact communities through financial grants and volunteer hours.
Rosendin provided complete engineering, procurement and construction services for the installation of an electric, solar energy system on 150 acres at the Cascade Solar Project located in Joshua Tree, CA. Before construction, tortoise fencing was installed around the site to protect the indigenous Desert Tortoise, and other wildlife and the project was required to employ archaeologists and geologists on site, at all times, to protect the historical significance of this property to Native Americans. The Arizona Desert Monsoon with rain, wind, and dust added to the challenges that had to be overcome by Rosendin to deliver this project in 66 working days; on time and under budget.
The Cascade Solar Park project was completed in 66 days while preserving wildlife and sites of historic significance.
DC Flat Panel System
Working Days to Completion
Acre Footprint
Cascade Solar is a 24 MW single-axis tracker system utilizing crystalline modules, located on 150 acres in Joshua Tree, California. Rosendin successfully met the demands of an accelerated schedule, completing the project within 66 working days.