Skip to Content

Rosendin Rosendin

Boulevard, CA

Tule Wind Project

Project Summary

The Tule Wind Project 131 MW wind farm is located in McCain Valley in eastern San Diego County. The farm includes 57 GE 2.3 MW wind turbines, an underground and overhead collection system, and a substation. Rosendin constructed seven miles of underground and overhead 138kV transmission lines as well as 35 miles of 35kv underground and overhead collection line poles.

Offices

Tule Wind Project

131 MW wind farm located in eastern San Diego County

Location
Boulevard, CA
Client
Avangrid Renewables
Duration
18 Months
Size
131 MW

Project Facts

131

MW

57

GE 2.3 MW Turbines

138

kV