Wind Energy

Wind Energy Center (Texas)

Back
Location: 
Texas
Industry: 
Wind Energy
Size: 
725.5 MW

The Wind Energy Center was built in three (3) phases over three (3) years.

  • Phase I:  New 200 MW Wind Farm
  • Phase II: 130 2.3 mw Siemens turbines w/ (2) Separate Substations consisting of 160 MVA and 230MVA
  • Phase III: 151 GE 1.5mw turbines w/ (1) substation consisting of 120mva
k
The Design-Build delivery method resulted in lower costs, a faster schedule, enhanced green features, and required fewer change orders.
— Aki K. Nakao, Director, GSA