Wind Energy

Wind Energy Center (California)

Back
Location: 
California
Industry: 
Wind Energy
Size: 
600 MW

The wind design-build project was built in four phases over two years.

  • Four (4) 150 MW Substations
  • MVA Nameplate
  • Two (2) 230kV switchyards
  • 8 miles 230kV Transmission line
k
Your crew did an exceptional job laying out the work to be performed; planned and provided the necessary tools to do the work; and performed the work in a safe and professional manner. Rosendin Electric should be very proud of this crew and the integrity and professionalism they brought to perform this task.
— Greg Stowe, Building Inspector II - County of Sacramento