Wind Energy

Phase III Wind Farm (Texas)

Back
Location: 
Texas
Industry: 
Wind Energy
Size: 
200 MW

The three phase design-build wind farm consists of 305 wind turbines and has an installed capacity of 457.5MW, making it one of the ten largest wind farms in the US. Rosendin Electric was involved in Phase III. This project lies on 65,000 acres and includes 133 turbines, one (1) substation and an expansion of a 345kV Switchyard, and 22 miles 345kV transmission line.

k
The service and performance that Johnson Controls, Inc. has received on the current retrofit project from Rosendin Electric has been exceptional and professional. They are truly a high-caliber firm with experienced resources.
— Johnson Controls, Inc.