230.5 MW

The design-build Energy Center Wind Projects were comprosed of collection systems, two substations, and 11 miles 138kV Transmission Line built in two (2) phases over two (2) years.

Energy Center I contains 87 General Electric wind turbines rated at 1.5 MW each for a total size of 130.5 MW. The estimated annual energy production capability is 482 million kW hours.

Energy Center II contains 80 General Electric wind turbines rated at 1.5 MW each for a total size of 120 MW. The estimated annual energy production capability is 440 million kW hours.