Solar Power

North Palm Springs Solar

Back
Location: 
Desert Hot Springs, CA
Industry: 
Solar Power
Size: 
2.8 MW

Performing as the turnkey EPC contractor, Rosendin Electric installed 2.8 megawatts of single axis tracking solar arrays, with (12,320) 230W multi‐crystalline modules and (5) SMA 500kW inverters feeding into the grid at 12kV.

k
"By being energy efficient and implementing other green practices, San Jose's City Hall will yield annual savings of more than $30,000 in energy costs alone."
— San Jose Mayor, Chuck Reed