USAF Aerodynamics Complex

Back
Location: 
Moffett Field, CA
Industry: 
Institutional
Feature: 
Design-Build
Size: 
4,800 Manhours

Rosendin Electric was the choice design-build electrical contractor for the U.S. Air Force National Full-Scale Aerodynamics Complex 150 Hz mG Set Relocation project at the NASA Ames Research Center.  With a peak crew of 17, nearly 4,800 manhours were performed without incident.  Scope of work included:

  • Design of new structural steel support system for cable tray and conduit systems
  • Crane and/or rigging for installation of 12 pieces of equipment
  • Confined space work in manholes
  • High traffic area
  • 7’ deep trench utilizing shoring and sloping methods
  • Approximately 30,000’ of control cables
  • Approximately 20,000’ of 5kV and 15kV cables
  • Hazardous material coordination – lead paint, transit pipe connections
  • Develop connection method to tie into 18 existing transit raceways