Location: 
Maiden, NC
Industry: 
Data Centers
Size: 
200,000 SF

Rosendin Electric was engaged to provide electrical construction services for this two phase build-to-suit data center for an existing technology client.  The build consisted of over 200,000 GSF tilt up construction, inclusive of supporting electrical infrastructure comprised of diesel generation, UPS plants and distribution. The data floor proper was fitted out with busway distribution to accommodate the clients racking layout, as well hot aisle containment throughout the data floor. In addition to the critical elements, this construction project included over 8,000 SF of supporting Class A office space.

  • Design-Assist
  • 200,000 SF
  • 40MW N+2 IT Load

Lead. Inspire. Build.